Products

Workstations

The depot concerned needed to service heating and ventilation units fixed in the roof of locomotives. Access had to be from overhead in a narrow shed with restricted height. A difficult situation made worse by utilities running along the walls which were in the way of clear lifting.

The solution was an overhead crane with a “dog leg” beam. The ventilation unit was lifted into a restricted clear space above the cab and then driven away by the overhead crane where it is taken over the platform and runs parallel to the locomotive and is lowered to a receiving cart. A replacement unit could then be picked up and run back to be fitted. The system has high level platforms on both sides of the train with flaps that can be lowered to seat on the roof. Once lowered and locked operators can pass over the roof with easy work access.

Custom options

The depot concerned needed to service heating and ventilation units fixed in the roof of locomotives. Access had to be from overhead in a narrow shed with restricted height. A difficult situation made worse by utilities running along the walls which were in the way of clear lifting.

The solution was an overhead crane with a “dog leg” beam. The ventilation unit was lifted into a restricted clear space above the cab and then driven away by the overhead crane where it is taken over the platform and runs parallel to the locomotive and is lowered to a receiving cart. A replacement unit could then be picked up and run back to be fitted. The system has high level platforms on both sides of the train with flaps that can be lowered to seat on the roof. Once lowered and locked operators can pass over the roof with easy work access.

Documentation

The depot concerned needed to service heating and ventilation units fixed in the roof of locomotives. Access had to be from overhead in a narrow shed with restricted height. A difficult situation made worse by utilities running along the walls which were in the way of clear lifting.

The solution was an overhead crane with a “dog leg” beam. The ventilation unit was lifted into a restricted clear space above the cab and then driven away by the overhead crane where it is taken over the platform and runs parallel to the locomotive and is lowered to a receiving cart. A replacement unit could then be picked up and run back to be fitted. The system has high level platforms on both sides of the train with flaps that can be lowered to seat on the roof. Once lowered and locked operators can pass over the roof with easy work access.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Get in touch to discuss your next project

icon design

DESIGN

We have a full engineering design capacity. Generally we use Solid Works which means we can supply 3D images with the ability to rotate.

icon prototype

PROTOTYPE

We have in house 3D printing and regularly supply samples. We use this facility to make parts as well. We can fabricate one off samples and can machine most parts in house.

icon manufacture

MANUFACTURE

We offer machining and fabricating for both one off, small batch and volume requirements.

icon supply

SUPPLY

We have regular repeat orders from around the world. So far we have been able to compete for and complete orders.

Downloads

Please fill in the form below. Once the form is submitted we will email a password and link to view the downloads section.

Please let us know which documents you would like to download.