About the Project

This was performed using a crane on a “dog leg” beam. The unit was lifted into a restricted clear space and then driven away on the overhead crane and lowered to a receiving cart on the platform A replacement unit could then be picked up and run back to be fitted. Every direction was difficult – the roof was very low, utilities ran along the walls and were in the way and creating access platforms for operators to work made things even more problematic.

We have made variations of this unit.